Sep 18, 2023

Eine Nachricht hinterlassen

1. Before the test machine, the operator is required to be familiar with the content of this manual, understand the working performance of each part of the machine, and the function of each button on the control panel.
2. Preparatory work before test machine:
When using this machine, it should have a three-phase AC power supply, and be reliably grounded or connected to zero according to the requirements of the local power supply system regulations.



3. Debugging and operation

Anfrage senden